This project involves the supply and export of a duct connecting cyclone C5 to cyclone C4 in the precalciner tower at the Lafarge plant in Saint-Pierre-la-Cour, France. It is part of the maintenance and optimization of the raw material preheating process in clinker production.
IMYAS Company was responsible for the fabrication and supply of the steel duct linking cyclone C5 to cyclone C4. We handled the design, manufacturing, and export of this structure in full compliance with the project’s technical requirements.
Our contribution ensured the quality and durability of the equipment within a demanding industrial environment.